New Project At The Farm

We’ve been working on this project (PMM-2010) for a year, and we finally have it figured out. It involves our hydroelectric project.

We plan to generate electricity and using the pump hydro idea, we will pump the water back up to a reservoir and generate electricity continually as the water runs back down hill. Using the same water, this can keep on going forever. All we will have to do is compensate for evaporation.

The system will generate 74 KW of power, which we will use to run all our coolers, our water pumps and we’ll even have a place for our employees to plug in their plug-in electric vehicles. And the extra power will go to HELCO, for which we will get a monthly check.